b'PUBLIC SAFETYFIREBenefitsTo improve the operations of the FireDepartment in effectiveness, safety, Project Public Safety (Fire) Projects Estimated Costand efficiency through: NumberRecruiting and retaining thehighest quality employees 1 Replace Two Reserve Engines - 2007/2008 $1,500,000 Providing exceptional trainingLeveraging technology in support 2 Purchase New Engine - Station 85 $750,000 of operationsReplace Two Reserve Medic Ambulances F450 -Strategically locating resources 3 2013/2015 (w/ EKG and Lucas) $900,000to maximize efficiency andresponse capabilities 4 Replace Quint 84 -2004 $1,500,000 Needs Assessment 5 Replace Station 84 Generator $100,000The Peachtree City Fire Departmentis in need of improvements to its 6 Turnout Gear Washer and Dryer for Each Station $84,000inventory of apparatus, (Six Total)communications, and personalprotective equipment. The Fire 7 Long Term EMS Equipment Replacement $70,000Department is also in need of a newfire station, on the southside of 8 Extrication Rams for Engines $88,000Peachtree City, for better coverage ofthat area. The previous SPLOST was 9 Digital Radios Replacement & Expansion $170,000utilized to replace apparatus and keepour fleet at top operating capacity. 10 Station 85 Construction - Southside $2,500,000These proposed replacement projectsmaintain the current replacementschedule for fire apparatus. The City 11 Station 82 Construction - Eastside $2,800,000is also proposing new equipment tobetter protect our employees and Public Safety (Fire) Total $10,462,000citizens such as turnout gear washersand dryers for each station and anextraction ram for each fire engine. PTC SPLOST 2023|8'