b'PATHSSafety and Traffic Flow Improvements for CorrugatedMetal Path TunnelsProject Number: 28Category: PathsLocation: CitywideEstimated Cost: $3,500,000Project Description:Peachtree City has a total of 17 Corrugated Metal Tunnels on the multi-use path system. Most of these tunnels are older tunnelsfrom when the path system was first being implemented. This project would allocate funds for study, design, and construction for potential tunnel replacements or enhancements. This includesconsiderations for safety and traffic flow. The most heavilytrafficked tunnels will be prioritized, including three tunnel locations that have been verified to have similar traffic numbersto our bigger concrete tunnels under state highways. These tunnelsare T-08 (Taco Bell, Crosstown), T-09 (Regions Bank/Crosstown),and T-11 (Luther Glass Park). The projects will look at the possibilityof replacing these tunnels with two-way concrete tunnels. If not possible,we will also look at enhancing approach visibility. If funding allows, the citywill also look at other tunnel locations throughout the city. PTC SPLOST 2023|28'