b"PATHSPath Construction - CitywideProject Number: 22Category: PathsLocation: CitywideEstimated Cost: $3,445,000Project Description:Peachtree City currently has 97.5 miles of pathinfrastructure to maintain. The City's goal is toconstruct/reconstruct/repave 10 miles of path per year.This keeps the system on a 10 year maintenance cycle.The 2017 SPLOST included funding for 3 additionalmiles to be done per year (which allowed the City toattain the 10 mile goal). The City proposes to keep thatfunding in place with the 2023 SPLOST. All paths areevaluated by staff for pavement distresses such ascracking, potholes, rutting, roughness, and common rootintrusion due to the surrounding environment of the pathsystem. Paths are then assigned a numerical pavementcondition rating that is used to prioritize the schedule forreconstruction. The prioritized list of paths is updated ona bi-annual basis to determine funding priorities. Thisproject would also allow funding for new pathconnections to the citywide system as needed throughgrowth or according to the City's Path Master Plan.PTC SPLOST 2023|24"