b"ROADSNew Village Signage:Project Number: 32Category: RoadsLocation: CitywideEstimated Cost: $180,000Project Description: Peachtree City maintains village monument signs throughout the city. The six villages of Peachtree Cityare Kedron, Aberdeen, Glenloch, Wilksmoor, Braelinn, and the Industrial Village. Over the years, some ofthese signs have fallen into disrepair and have been removed. They were never replaced. The signs thatremain are also beginning to show signs of age. This proposed project would provide funding to replace allexisting village signage and add new village signage at proper locations throughout the city at majorvillage transition points. This project is meant to reinforce the City's support and investment in the villageconcept and provide citizens with a sense of pride for their respective villages. Replace Street Sweeper:Project Number: 33Category: RoadsLocation: Public WorksEstimated Cost: $190,000Project Description: As part of road maintenance operations, our staff operates theCity's street sweeper. The street sweeper is important, not onlyto keep our roads and streets looking great, but also because itkeeps debris and trash out of our storm water system. As partof our state storm water permit, the City is required to sweepour streets for this very reason. It is imperative that our streetsweeper be in good operational and not be a maintenanceliability. Our current street sweeper has begun to show signs ofage and is beginning to be a maintenance liability. Toguarantee operational efficiencies, thisproject proposes aninvestment in a new street sweeper. This new street sweeperwould replace a 2011 street sweeper with 1,895 hours. The oldstreet sweeper will be placed in reserve or surplused. PTC SPLOST 2023|35"