b'PATHSPath Transition Reconstruction- CitywideProject Number: 23Category: PathsLocation: CitywideEstimated Cost: $500,000Project Description:Peachtree City currently has 239 at-grade pathsystem crossings. This project would include acomplete inventory and analysis of all at-gradecrossings and transitions to roads throughout thecity. It would also fund the design of all crossingsand transitions to be brought up to current MUTCDstandards as well as providing smooth transitions forcarts, walkers, and cyclists. This is necessary toprovide easy transition for disabled citizens as wellas to get path users across crosswalks and into thepath system quicker so as not to be in the roadwaytrying to navigate over a curb. Other considerationsto be undertaken with redesigning crosswalktransitions will be proper signage and storm drainage. PTC SPLOST 2023|25'